Fixing What’s Wrong Around the House

I’m going to be unemployed as of the 21st of August. So I’ve started getting ready to rip the house apart.

Plan A was to replace the tub with a shower, but a realtor told me that a lot of people still want a tub. So, I’ve left the wallboard in place and I’m shopping for a new surround.
Getting ready for the new surround

That’s only if I can get the stains out of the tub. If not, I’ll replace it too.

After that, it’s back to the kitchen and a new counter, and so-on.

I figure I’ve got a good six weeks worth of work around the house before I need to start worrying about what to do with my time.

Leave a Reply

Your email address will not be published.

WordPress spam blocked by CleanTalk.